Skip to content
MakotukutukuAncient Cape Wanbrow
Menu

Restoration area

The Zigzag

Where the work is. The 2026 season went in here.

Planting under way2.9 hectaresPlanting continues each autumn and springBlocks 17, 18, 15, 16

Plants going into the ground, working bee by working bee.

A steep grassy slope of pale tussocky grass with scattered dark green shrubs and two broad ngaio crowns against a blue sky.
“Looking up across the proposed planting area towards the Lookout.”Ma Kōtukutuku – Ancient Cape Wanbrow Trust · The zigzag before planting: grass, a few scattered natives, and nothing between them. A small copy, 640 × 480 — the only version of this photograph we still have.

How far we have got

Already carries cover
12%
0.36 ha of 2.88. Mapped by extent rather than by species.
Planted by the project
11%
2,872 m² of the 2.52 ha of bare ground here.

These two figures are never added together, and the map draws them separately, block by block. Cover that was already here is not restoration — in one block of this project it is pine.

The blocks behind this place

Survey Waitaki, August 2025
  • Block 171.02 ha · sloped - steep · 16% already vegetated

    Main access point from lookout carpark, side of 1st gully down to bottom

    2,872 m² planted so far.

  • Block 180.61 ha · flat-sloped · 31% already vegetated

    Floor at the upper half of gully 1 below lookout

  • Block 150.60 ha · sloped - steep · no existing cover

    Side of ridge at the top of the 1st gully, below houses

  • Block 160.65 ha · sloped · no existing cover

    Top of 1st gully next to houses

Where we are now

The side and floor of gully 1 below Lookout Point, from the top car park down to the bottom. The least vegetated ground in the project — two of these four blocks carry no existing cover at all — and the only ground the project has planted at any scale.

What it becomes

Cover the length of the gully, from the houses at the top to the car park at the bottom, along the walk almost every visitor to the Cape already takes.

Why this matters

This ground was chosen first, and for a reason: planting where people already walk is what keeps a volunteer project moving. Every working bee here is watched by somebody out with a dog, and several of those people came back the next time with a spade.

“Both of these sites are east-facing, and easier than most of the Cape, in that they will have better soil, and a bit more moisture. Also, they are very accessible and visible to the public, which is important for the momentum of the project.”

— Makotukutuku, on choosing this ground, 2026

What needs to happen

4 of 8
  • Surveyed, measured and described
  • Strimmed and spot-sprayed, ready to plant
  • Planting begun
  • Protectors, stakes and water on
  • Planting completed across the bare ground
  • Released and weeded, bi-monthly
  • Grass held back two years, or until the trees reach 2 m
  • Away on its own
A view east across a shallow gully of rough grass and scrub, with a young planted shrub in the foreground.
“Looking East across the middle of the planting area.”Ma Kōtukutuku – Ancient Cape Wanbrow Trust · A small copy, 640 × 480 — the only version of this photograph we still have.
Four people at the Lookout Point car park with a wheelbarrow of plants, a ute and the multi-arm direction signpost behind them.
The morning of the 16 May 2026 planting — 425 plants, 35 volunteers.Ma Kōtukutuku – Ancient Cape Wanbrow Trust · The only dated planting-day photograph we have.

Grey warblers in a weed

In August 2026 a pair of riroriro were recorded nesting in the flowering currant beside the path down from Lookout Point. The currant is a weed the project is working to remove — which is the honest shape of restoration: the birds are already using whatever is here.

Connected to

Surveyed boundary

The shape on the map is the Trust’s own: planting blocks surveyed by Survey Waitaki in August 2025 and mapped in ArcGIS, or a layer exported from that map. The area and length quoted here are measured from it, and the block areas agree with the Trust’s own chart to better than 0.15%.

Not settled yet

The name here is ours, not an official one — the ground is surveyed, planned and funded as the numbered blocks listed above.

See this place on the Cape →