Restoration area
Gully Two
The second gully — its floor, its head, and the face above it.
Nothing done on the ground here yet.
How far we have got
- Already carries cover
- 63%
- Planted by the project
- 0%
- Nothing yet — 0.9 ha of bare ground here.
The 3 surveyed blocks behind this place
Block 51.12 ha · flat - sloped · 51% already vegetated
Floor of gully 2, up to vehicle track
Block 120.83 ha · sloped - steep · 66% already vegetated
Head of 2nd gully above along fence line above track seperating area from block 5
Block 190.54 ha · steep · 82% already vegetated
Steep south side of spur 2 below vehicle track
Where we are now
The floor of gully 2 up to the vehicle track, the head of the gully along the fence line, and the steep south side of the second spur below the track.
What it becomes
A gully under continuous cover from floor to head.
Why it is in the plan
Gully floors hold moisture and shelter, which makes them the cheapest place on an exposed headland to grow tall trees.